Bridge 823, drop wall deshuttering and concreting work.
Bridge 823, drop wall deshuttering and concreting work.:Bridge 823, drop wall deshuttering and concreting work.

OHE pedestal casting at bridge 786
OHE pedestal casting at bridge 786:OHE pedestal casting at bridge 786

bridge 845
bridge 845:bridge 845

bridge 845 P4
bridge 845 P4:bridge 845 P4

bridge 845 P8
bridge 845 P8:bridge 845 P8

bridge 845,P3,P4P5
bridge 845,P3,P4P5:bridge 845,P3,P4P5

bridge 845,A2 pike work
bridge 845,A2 pike work:bridge 845,A2 pike work

blanket top, pit at toe-3.8m,Ch-639.300,fdd check
blanket top, pit at toe-3.8m,Ch-639.300,fdd check:blanket top, pit at toe-3.8m,Ch-639.300,fdd check